
| Benefits | ||||||||||||||
|
|
| Properties | |
| Curing | |
| Work life at 23°C | 90 minutes |
| Time to handling at 23°C | 24 hours |
|
Time to full cure at 23°C |
about 7 days |
|
Time to full cure at 85°C |
2 hours |
| Typical Performance (measurements @ 23°C) | |
| Lap shear (Al/Al) | 20 MPa |
| Peel strength (XPLE/XPLE) | 370 N/25mm |
| Peel strength after thermal shock (4hrs@215°C) | 370 N/25mm |
| Dynamic shear (boot/cable shell size 22) | 520N |
| Solvent resistance (de-icing fluid, petrol, oil, hydraulic fluid) |
Excellent |
| Operating temperature | -75°C to +150°C |
| Colour | Black |